PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bathroom roughing at Rooms 132, and 136 Facing North (800x600).jpg Fibertech on site at Cherry Street  (800x600).jpg Fireproofing continues at the 1st Floor Facing South (800x600).jpg Installing duct work hangers at the 2nd Floor Facing West (800x600).jpg Installing top metal track at the 2nd Floor Facing North (800x600).jpg Continued patching Stair -2 (800x600).jpg Continued welding the tube steel at the top of the Main steel column Facing East (800x600).jpg Door frames delivery for the 1st floor Facing West (800x600).jpg Installing split wire above the cealing at the 2nd floor Facing West (800x600).jpg
Previous pageNext page Installing top metal track at the 2nd Floor Facing North (800x600)